Silton solar park 5MW, construction period February - March 2014


A time lapse of the building of Silton solar park, built around February, March 2014. 

The solar park is 27 acres big and can produce 4,850,000 kWh over the course of a year and has a capacity of 5 MWp. UK had 100mm of rain in the two weeks before Biosar started building and 240mm during the build period.


IT WAS CONNECTED ON TIME!



For the above achievement i would like to congratulate my colleagues:

Evangelos Chrisopoulos Project Manager 
and
Anastasios Filippopoulos Site Manager 